0.24P

Tring Road Gas Peaker Project

Tring Road Gas Peaker Project

Tring Road Gas Peaker

Key Facts

50MW "Shovel Ready" Gas Peaker Plant
FGS Owns a 40% Interest
Exploring Funding and Battery Hybrid Options
Strategic Partnership with Arlington Energy - Developer of Flexible Energy Assets

Tring Road 50MW Gas Peaker

Corcel has acquired a 40% interest in the Tring Road energy project from Arlington Energy, located outside of the town of Aylesbury, England.  

Corcel and AE have formed an industry standard joint venture to operate the project and will look to jointly take the project forward to funding and construction.  Options to convert the site to a hybrid battery installation are also under consideration.

 

Tring Road 50MW Gas Peaker

Corcel has acquired a 40% interest in the Tring Road energy project from Arlington Energy, located outside of the town of Aylesbury, England.  

Corcel and AE have formed an industry standard joint venture to operate the project and will look to jointly take the project forward to funding and construction.  Options to convert the site to a hybrid battery installation are also under consideration.

 

Updates

Showing All
RNS announcements
Twitter
crossmenuchevron-right linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram