1.90P

50MW Energy Storage + 50MW Grid Connection

50MW Energy Storage + 50MW Grid Connection

Burwell Battery Storage

Key Facts

Flexible Grid Solutions Owns 100% of the Burwell Project
Project Economics Sanctioned - Moving to "Shovel Ready" Status
Project Set to Energise in 2022 - Intends to Enter the Capacity Market in 2026
Project Owns Last 100MW Connection Available at the Substation

Overview

The Burwell battery storage is a 50MW  project located outside of the town of Burwell, Cambridgeshire.  FGS also owns an additional 50MW of grid connection at site.

Overview

The Burwell battery storage is a 50MW  project located outside of the town of Burwell, Cambridgeshire.  FGS also owns an additional 50MW of grid connection at site.

Status

The Burwell Energy Storage project is expected to begin operations in early 2022, and intends to enter the Capacity market in 2026, providing a fixed and guaranteed source of revenue over an initial 15-year period.  Basic project economics have now been approved and the project is now moving towards "shovel ready" status, expected during 2021.

Updates

Showing All
RNS announcements
Twitter
crossmenuchevron-right linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram